4,000 bottles/hour bottled water production line shipped to Nigeria

4,000 bottles/hour bottled water production line shipped to Nigeria

Jul 01, 2019

4,000 bottles/hour bottled water production line shipped to Nigeria

Today, our workers packed the machines and shipped them to Nigeria. The picture below shows our careful packaging and avoids unnecessary damage during transportation. For Proman, the customer is our God and the quality is the needs of God.